Petrie Construction LLC

Demolition of AMC Theatres

After a severe thunderstorm in late July caused heavy erosion and redirected the stream bed, RemacUSA, Inc. was called in to restore the natural flow, replace damaged infrastructure, and protect neighboring properties from future flood risks.

CLIENT:

LOCATION:

YEAR COMPLETED:

SCOPE

CHALLENGES

SOLUTIONS

FINAL OUTCOME

Petrie Construction LLC

Bethesda, MD

2023

1. Full structural demolition of AMC theater

2. Asbestos and universal waste abatement

3. Onsite material processing and export

4. Site prep for future construction

Demolition occurred adjacent to active mall access roads and pedestrian traffic.

REMAC implemented perimeter fencing, off-hours trucking, dust suppression systems, and worked in phases to limit impact on nearby retail tenants.

The AMC building was fully demolished on time and without incident. The cleared site was turned over to the general contractor ahead of schedule, allowing vertical construction on the new mixed-use project to begin. REMAC’s work was completed under strict safety and environmental compliance and received positive feedback from the developer and local building officials.

STRUCTURAL DEMOLITION

  • The entire theater structure, including large-span roof trusses, auditorium seating bowls, concrete slab-on-grade, and façade walls, was demolished using a combination of high-reach and standard excavators.

ASBESTOS ABATEMENT

  • REMAC performed pre-demolition abatement, including removal of asbestos-containing flooring, fireproofing, and pipe insulation in mechanical rooms, with third-party clearance.

UNIVERSAL WASTE DISPOSAL

  • Light fixtures, electronic equipment, thermostats, and mercury bulbs were identified, separated, and disposed of at approved facilities.

MATERIAL HANDLING & EXPORT

  • All recyclable metals were sorted and transported to local scrap facilities. Concrete and masonry debris were hauled offsite for crushing and reuse.