Private Neighborhood Association

Stormwater Restoration

After a severe thunderstorm in late July caused heavy erosion and redirected the stream bed, RemacUSA, Inc. was called in to restore the natural flow, replace damaged infrastructure, and protect neighboring properties from future flood risks.

CLIENT:

LOCATION:

YEAR STARTED:

YEAR COMPLETED:

SCOPE

CHALLENGES

SOLUTIONS

MATERIALS RECYCLED

FINAL OUTCOME

Private Neighborhood Association

Potomac, MD

2025

2025

1. Remove and replace damaged stormwater pipes

2. Rebuild the eroded stream pathway

3. Stabilize banks and prevent further erosion

The July 2025 thunderstorm caused excessive water velocity that deeply scoured the stream banks, displaced boulders, and widened the channel by several feet, damaging nearby lawns and undermining footpath access.

REMAC used topographic assessment tools and pre-storm maps to realign the stream to its original path. Erosion-resistant fill was compacted in layers to rebuild the banks, and geotextile fabric was used below the riprap to prevent future undermining.

1. Concrete & Debris

2. Excavated Soil & Boulders

REMAC restored the stream to a controlled, naturalized flow, protecting nearby homes from future erosion while enhancing the overall appearance of the landscape. The upgraded piping now accommodates greater water volume, and the reinforced banks provide long-term durability.

The homeowners’ association commended REMAC for swift response, respectful coordination with neighbors, and leaving the site cleaner than it was before.

STORMWATER REMEDIATION & STREAM REALIGNMENT

  • Excavated and regraded the eroded stream bed to reestablish a stable flow path

  • Reconstructed and compacted stream banks using clean fill and natural contours to resist future washouts

PIPE REMOVAL & REPLACEMENT

  • Safely removed collapsed or undersized storm pipes contributing to flow restrictions

  • Installed larger, corrosion-resistant HDPE piping to handle future high-volume runoff events

EROSION & SEDIMENT CONTROL (ESC)

  • Installed silt fencing and check dams prior to ground disturbance

  • Deployed riprap and turf reinforcement matting post-restoration to stabilize stream edges

SITE ACCESS & NEIGHBORHOOD COORDINATION

  • Excavated and regraded the eroded stream bed to reestablish a stable flow path

  • Reconstructed and compacted stream banks using clean fill and natural contours to resist future washouts